Taxonomy Path: Compressor & Cooling > HVAC & Combustion > Burners & Gas Trains
Overview
The
Bentone BG 450-2
is a two-stage gas burner at the top of Bentone’s intermediate family, above the BG 300 and BG 400. Bentone lists the BG 450 family at 90 to 550 kW and approves it to EN 676, with Annex J/K builds to EN 746-2 for industrial ovens, kilns and steam boilers. The two-stage BG 450-2 with LME22 control and a DUNGS MB-ZRDLE 412 to 420 gas train is documented in its manual at 120 to 550 kW on all four test gases, G20, G25, G30 and G31.
our engineering team supplies the Bentone BG 450-2 and its replacement parts to facility managers, boiler contractors and plant engineers in Oman and across the GCC, with engineering support in Muscat. At up to 550 kW this burner is sized for the main boilers of large hotels, hospitals, shopping malls, laundries and process plants, where a two-stage firing pattern gives a useful turndown without the cost of full modulation.
Operating Principle
Each start of the Bentone BG 450-2 follows the LME22 programme: air pressure check, fan start, a 20 second prepurge and 3 seconds of pre-ignition before the start gas is released and lit. An ionisation probe supervises the flame; the manual specifies a minimum ionisation current of 5 microamps with flame and a maximum of 20 microamps, a lockout within 3 seconds if no flame forms and a reaction within 1 second if the flame is lost. Faults are shown by a multi-coloured LED that blinks a code, for example two blinks for no flame at the end of the safety time and three blinks for an air pressure switch fault.
After ignition the Bentone BG 450-2 settles at stage 1 and steps up to stage 2 on demand. The air damper is moved by a damper motor whose cam discs define the closed, low-load and high-load positions, and a cam also switches the stage 2 gas valve. On the gas side the MB-ZRDLE has a 360 mbar maximum inlet pressure and slow-opening valves with separate start load, stage 1 and stage 2 adjustment. Its regulator range depends on size: 4 to 50 mbar for the 405 to 412 S50, and 4 to 20
| Delivery: | UPS, FedEx and DHL Express International delivery available Same day shipping for in-stock items on location Will negotiate custom freight & clearance details |
|---|---|
| Combined Shipping Policy: | We combine shipments to reduce costs for customers purchasing multiple items. After completing your selection, request a consolidated proforma invoice including shipping and handling. |
| Warranty: | All products are covered by Global Valve Hub — Industrial Supplies & Engineering Solutions. We record a functional test video before shipping. ✓ 3–12 Months Functional Warranty on New, Surplus & Refurbished Parts. |
| Returns: | No-hassle return and replacement policy. |
| Quick Quotes: | Receive Price & Availability Today! Email sales@globalvalvehub.com or WhatsApp +1 332 322 6825. |
| Payment Options: | Wire Transfer (T/T) PayPal Visa MasterCard |