Taxonomy Path: Emergency Power > UPS and Batteries
The
Riello UPS Master MPS MPT
is a transformer-based ON LINE double-conversion UPS for industrial processes, data rooms, telecommunications, security and electro-medical loads. The Master MPS range includes three-phase input and single-phase output versions (MPM) from 10 to 100 kVA and three-phase input and output versions (MPT) from 10 to 200 kVA. This page covers the MPT 10 to 80 kVA models of the datasheet; Riello UPS classifies the range as VFI-SS-111 under IEC EN 62040-3.
A robust isolated UPS for demanding industrial supplies
The inverter has an isolation transformer, the rectifier is a 6-pulse thyristor type with or without optional harmonic filters, and a 12-pulse rectifier is available on request for the 60 and 80 kVA three-phase versions. Progressive rectifier start-up (power walk-in) and an option to lower the battery charging current reduce the demand on generator sets and MV/LV transformers. The datasheet also lists Hot System Expansion, an efficiency-optimising mode for parallel systems, high overload capacity and suitability for capacitive and inductive loads.
Batteries can be VRLA AGM, GEL, NiCd, lithium-ion or supercapacitors, with one-level, two-level or cyclic recharge. Smaller models are also offered with internal batteries (BAT versions).
Technical specifications
Parameter
Specification
Models (three-phase output)
MPT 10, 15, 20, 30, 40, 60, 80
Rated power (kVA / kW)
10/9, 15/13.5, 20/18, 30/27, 40/36, 60/54, 80/72
Input
Three-phase 380 / 400 / 415 V, tolerance +20 / -25 percent at full load, 45 to 65 Hz, selectable 120 s soft start
Bypass
Three-phase plus neutral at 380 / 400 / 415 V; 50 or 60 Hz; tolerance 2 percent, adjustable from 1 to 5 percent
Output
Three-phase plus neutral, 380 / 400 / 415 V selectable; plus or minus 1 percent static stability; THD under 1 percent on linear and under 3 percent on non-linear loads; crest factor 3:1
Overload
110 percent for an hour, 125 percent for ten minutes, 150 percent for one minute
Battery
VRLA AGM o
| Delivery: | UPS, FedEx and DHL Express International delivery available Same day shipping for in-stock items on location Will negotiate custom freight & clearance details |
|---|---|
| Combined Shipping Policy: | We combine shipments to reduce costs for customers purchasing multiple items. After completing your selection, request a consolidated proforma invoice including shipping and handling. |
| Warranty: | All products are covered by Global Valve Hub — Industrial Supplies & Engineering Solutions. We record a functional test video before shipping. ✓ 3–12 Months Functional Warranty on New, Surplus & Refurbished Parts. |
| Returns: | No-hassle return and replacement policy. |
| Quick Quotes: | Receive Price & Availability Today! Email sales@globalvalvehub.com or WhatsApp +1 332 322 6825. |
| Payment Options: | Wire Transfer (T/T) PayPal Visa MasterCard |