Taxonomy Path: Motors, Pumps & Turbines > Gas Turbine Parts
Overview
The
Siemens Energy SGT-800
is an industrial gas turbine engineered for utility, oil & gas, and industrial power generation projects that demand high efficiency, fuel flexibility, and long-term reliability. With more than 620 units installed worldwide and over 20 million cumulative operating hours, the SGT-800 has built one of the strongest reliability track records in its power class, delivering gross power output from 45.3 MW up to 62.5 MW depending on the selected rating, with gross simple-cycle efficiency reaching 41.1%.
With fast quotation turnaround and technical support, our engineering team proudly supplies the
SGT-800
to utility power producers, independent power projects, and industrial cogeneration operators. Backed by genuine Siemens Energy manufacturing, technical documentation, and long-term service support, our engineering team ensures that customers across Muscat, Sohar, and Salalah have a local point of contact for this turbine platform.
Operating Principle
The
SGT-800
operates as a single-shaft industrial gas turbine built around a 15-stage axial compressor and a 3-stage turbine section, with the compressor casing vertically split for straightforward field maintenance. Ambient air is drawn through the compressor stages, progressively raised to a pressure ratio of up to 22.0:1, then mixed with fuel and combusted using a Dry Low Emission (DLE) combustion system before expanding through the turbine section to drive the 2-bearing rotor at a constant 6,600 rpm.
This architecture allows the SGT-800 to burn natural gas, Diesel No. 2, or dual-fuel combinations with on-load fuel changeover, and the DLE combustion system can burn up to 75% hydrogen by volume, giving operators a genuine path toward lower-carbon power generation. The practical result of this design is exhaust mass flow of up to 137.7 kg/s at exhaust temperatures between 547°C and 596°C depending on rating, heat suitable for high-efficiency combined-cycle and cogeneration configurations, low gas su
| Delivery: | UPS, FedEx and DHL Express International delivery available Same day shipping for in-stock items on location Will negotiate custom freight & clearance details |
|---|---|
| Combined Shipping Policy: | We combine shipments to reduce costs for customers purchasing multiple items. After completing your selection, request a consolidated proforma invoice including shipping and handling. |
| Warranty: | All products are covered by Global Valve Hub — Industrial Supplies & Engineering Solutions. We record a functional test video before shipping. ✓ 3–12 Months Functional Warranty on New, Surplus & Refurbished Parts. |
| Returns: | No-hassle return and replacement policy. |
| Quick Quotes: | Receive Price & Availability Today! Email sales@globalvalvehub.com or WhatsApp +1 332 322 6825. |
| Payment Options: | Wire Transfer (T/T) PayPal Visa MasterCard |