Taxonomy Path: Bearings & Power Transmission > Lubrication & Bearing Maintenance
The large TIH…m heater for gearbox, mill and pump bearings
The
SKF TIH 220m
is a robust induction heater suited to bearings up to 300 kg and solid components up to 150 kg. It belongs to the TIH…m range, which uses power electronics with current and overheating control. SKF quotes a 220 kg bearing heated in 20 minutes, with the example 23172 CC/W33 taken to 110 C.
Two yokes are supplied, covering bores from 60 mm up to a bearing weight of 300 kg, and a sliding arm carries the large yoke. For plants that overhaul large gearboxes, pump drives, fans and crusher bearings this is the heater class that replaces oil baths and torches.
Technical specifications
Parameter
Specification
Maximum bearing weight
300 kg (662 lb)
Solid components, maximum weight
150 kg (330 lb)
Bore diameter range
60 to 600 mm (2.3 to 23.6 in.)
Operating area (w x h)
250 x 255 mm (9.8 x 10 in.)
Coil diameter
140 mm (5.5 in.)
Standard yokes (included)
100 mm and 60 mm minimum bore diameter
Application example
23172 CC/W33, 220 kg, 110 C, 20 min
TIH 220m/LV: voltage and frequency
200 to 240 V, 50/60 Hz
TIH 220m/LV: max. power consumption
10.0 to 12.0 kVA
TIH 220m/MV: voltage and frequency
400 to 460 V, 50/60 Hz
TIH 220m/MV: max. power consumption
10.0 to 11.5 kVA
Temperature control
20 to 250 C (68 to 482 F)
Demagnetisation (SKF norms)
Below 2 A/cm
Dimensions (w x d x h)
750 x 290 x 440 mm (29.5 x 11.4 x 17.3 in.)
Total weight, incl. yokes
86 kg (189 lb)
Safety and handling features
An induction coil outside the housing shortens heating time and lowers energy use. Foldable support arms allow large bearings to be heated and reduce the risk of toppling. A magnetic temperature probe and a temperature mode preset at 110 C help prevent overheating, the remote control carries the display and control panel, and the smaller yoke stores inside the unit. Integrated handles help move the heater around the workshop. As SKF notes, the maximum temperature depends on the weight and geometry of the part.
Electrical d
| Delivery: | UPS, FedEx and DHL Express International delivery available Same day shipping for in-stock items on location Will negotiate custom freight & clearance details |
|---|---|
| Combined Shipping Policy: | We combine shipments to reduce costs for customers purchasing multiple items. After completing your selection, request a consolidated proforma invoice including shipping and handling. |
| Warranty: | All products are covered by Global Valve Hub — Industrial Supplies & Engineering Solutions. We record a functional test video before shipping. ✓ 3–12 Months Functional Warranty on New, Surplus & Refurbished Parts. |
| Returns: | No-hassle return and replacement policy. |
| Quick Quotes: | Receive Price & Availability Today! Email sales@globalvalvehub.com or WhatsApp +1 332 322 6825. |
| Payment Options: | Wire Transfer (T/T) PayPal Visa MasterCard |